Next tables contain the economic parameters that have been introduced in the Advanced cogeneration model model. All the data is extracted from the NEEDS report [1]. The correspond to the “Tubular CHP NG” data set for SOFC systems. The data for 2025 has been used for 2035 in the model.
| Specific investment [CHF2010/kWe] | ||
|---|---|---|
| 2035 | 2050 | |
| MIN | 3'135 | 1'380 |
| MID | 11'837 | 8'972 |
| MAX | 34'508 | 34'508 |
| O&M cost [CHF2010/kWe] | |
|---|---|
| 2035 | 2050 |
| 237 | 178 |
| Lifetime [years] | 20 |
|---|