Next tables contain the economic parameters that have been introduced in the CCGT (without CCS) model.

Specific investment [CHF2010/kWe]
2035 2050
MIN 739 [1] 702 [1]
MID 914 [1][2][3][4][5]877 [1][2][3][4][5]
MAX 1'300 [2]1'300 [2]
O&M cost [CHF2010/kWe]
2035 2050
25 [3]25 [3]
Lifetime [years] 25 [1]

Next tables contain the economic parameters that have been introduced in the CCGT (with CCS) model.

Specific investment [CHF2010/kWe]
2035 2050
MIN 1'394 [4]1'200 [5]
MID 1'537 [2][3][4]1'392 [2][4]
MAX 2'000 [2]1'800 [2]
O&M cost [CHF2010/kWe]
2035 2050
44.1 [3]35.5 [3]
Life time [years] 25 [1]