Next tables contain the economic parameters that have been introduced in the nuclear power model. Complementary information about data and assumptions is available in Updates.

Specific investment [CHF2010/kWe]
2011 2035 2050
MIN 4'864 8'294 8'294
MID 9'331 9'331
MAX 10'368 10'368
O&M cost [CHF2010/kWe]
2011 2035 2050
237 [9]135 [6][7][9]135 [6][7][9]
Lifetime [years]2011 50 [8]
2035 60 [4][7]
2050 60 [4][7]
Fuel cost [CHF2010/MWhe]
2011 2035 2050
MIN 18.65 14.68 14.68
MID 16.18 16.18
MAX 17.45 17.45