Next tables contain the economic parameters that have been introduced in the nuclear power model. Complementary information about data and assumptions is available in Updates.
Specific investment [CHF2010/kWe] | |||
---|---|---|---|
2011 | 2035 | 2050 | |
MIN | 4'864 | 8'294 | 8'294 |
MID | 9'331 | 9'331 | |
MAX | 10'368 | 10'368 |
Fuel cost [CHF2010/MWhe] | |||
---|---|---|---|
2011 | 2035 | 2050 | |
MIN | 18.65 | 14.68 | 14.68 |
MID | 16.18 | 16.18 | |
MAX | 17.45 | 17.45 |
[1] IEA (2014), WEIO 2014-Power Generation Investments Assumptions.
[3] PSI(2010), ENERGIE-SPIEGEL
[4] VSE(2012), Energie nucléaire
[5] European Commission (2011), Energy Roadmap 2050, Impact assessment and scenario analysis
[7] PROGNOS(2008), Kosten Neuer Kernkraftwerke
[8] World Nuclear Association website, Nuclear power in Switzerland
[9] Court des comptes (May 2014), LE COÛT DE PRODUCTION DE L’ÉLECTRICITÉ NUCLÉAIRE, Actualisation 2014