This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
d_adv_cogen_cost [2014/08/17 17:03] – [Advanced cogeneration cost] codina | d_adv_cogen_cost [2023/11/16 15:21] (current) – external edit 127.0.0.1 | ||
---|---|---|---|
Line 1: | Line 1: | ||
+ | ====== Advanced cogeneration cost ====== | ||
+ | Next tables contain the economic parameters that have been introduced in the [[d_adv_cogen|Advanced cogeneration model]] model. All the data is extracted from the NEEDS report < | ||
+ | ^ Specific investment [CHF< | ||
+ | ^ ^2035 ^2050 ^ | ||
+ | ^MIN |3'135 |1'380 | | ||
+ | ^MID |11' | ||
+ | ^MAX |34' | ||
+ | |||
+ | ^ [[o_m_cost|O& | ||
+ | ^2035 ^2050 ^ | ||
+ | |237 |178 | | ||
+ | |||
+ | ^[[life_time|Lifetime]] [years] |20 | | ||
+ | |||
+ | ===== References ===== | ||
+ | [1] [[http:// |