 +====== Coal power plant cost ======
 +Next tables contain the economic parameters that have been introduced in the [[coal|Coal power plant]] (without [[co2_storage|CCS]]) model.
  
 +^  Specific investment [CHF<sub>2010</sub>/kW<sub>e</sub> ^^^^^
 +^ ^  2035-2050  ^^^^
 +^::: ^SC ^USC ^A-USC ^IGCC ^
 +^MIN |1'393 <sup>[[#References|[6]]]</sup> |1'624 <sup>[[#References|[6]]]</sup> |2'400 |1'184 <sup>[[#References|[2]]]</sup>|
 +^MID |2'127 <sup>[[#References|[1]]]</sup><sup>[[#References|[2]]]</sup><sup>[[#References|[4]]]</sup><sup>[[#References|[5]]]</sup><sup>[[#References|[6]]]</sup>|1'989 <sup>[[#References|[1]]]</sup><sup>[[#References|[6]]]</sup>|2'400 |1'986 <sup>[[#References|[1]]]</sup><sup>[[#References|[2]]]</sup><sup>[[#References|[3]]]</sup><sup>[[#References|[4]]]</sup><sup>[[#References|[6]]]</sup>|
 +^MAX |2'487 <sup>[[#References|[2]]]</sup>|2'261 <sup>[[#References|[1]]]</sup>|2'400 |3'079 <sup>[[#References|[2]]]</sup>|
 +
 +^  [[o_m_cost|O&M cost]] [CHF<sub>2010</sub>/kW<sub>e</sub> ^^^^
 +^  2035-2050  ^^^^
 +^SC ^USC ^A-USC ^IGCC ^
 +|61.4 <sup>[[#References|[1]]]</sup>|67.8 <sup>[[#References|[1]]]</sup>|67.8 <sup>[[#References|[1]]]</sup>|82.9 <sup>[[#References|[1]]]</sup>|
 +
 +^[[life_time|Life time]] [years] |40 <sup>[[#References|[5]]]</sup>|
 +
 +Next tables contain the economic parameters that have been introduced in the [[coal|Coal power plant]] (with [[co2_storage|CCS]]) model. The investment for the plants with [[co2_storage|CCS]] has been considered to be 60% <sup>[[#References|[3]]]</sup> higher respect to the same technology without [[co2_storage|CCS]] for SC, USC and A-USC, while the IGCC-CCS is assumed to have 20% <sup>[[#References|[3]]]</sup> higher investment cost.
 +
 +^  Specific investment [CHF<sub>2010</sub>/kW<sub>e</sub> ^^^^^
 +^ ^  2035-2050  ^^^^
 +^::: ^SC ^USC ^A-USC ^IGCC ^
 +^MIN |2'229 |2'598 |3'840 |1'421 |
 +^MID |3'403 |3'182 |3'840 |2'384 |
 +^MAX |3'979 |3'617 |3'840 |3'695 |
 +
 +^  [[o_m_cost|O&M cost]] [CHF<sub>2010</sub>/kW<sub>e</sub> ^^^^
 +^  2035-2050  ^^^^
 +^SC ^USC ^A-USC ^IGCC ^
 +|86 <sup>[[#References|[1]]]</sup>|93.9 * |93.9 *|110 <sup>[[#References|[1]]]</sup>|
 +
 +The O&M cost for USC-CCS and A-USC-CCS is based on the following formulas:
 +
 +$O\&M_{USC-CCS} = \frac{O\&M_{SC-CCS}}{O\&M_{SC}}*O\&M_{US}$
 +
 +$O\&M_{A-USC-CCS} = \frac{O\&M_{SC-CCS}}{O\&M_{SC}}*O\&M_{A-USC}$
 +
 +^[[life_time|Lifetime]] [years] |40 <sup>[[#References|[5]]]</sup>|
 +
 +
 +===== References =====
 +[1] [[http://www.worldenergyoutlook.org/media/weowebsite/2014/weio/WEIO2014PGAssumptions.xlsx|IEA (2014), WEIO 2014-Power Generation Investments Assumptions.]]
 +
 +[2] [[http://www.iea.org/publications/freepublications/publication/TechnologyRoadmapHighEfficiencyLowEmissionsCoalFiredPowerGeneration_Updated.pdf|IEA(2012), Technology Roadmap: High-Efficiency, Low-Emissions Coal-Fired Power Generation]]
 +
 +[3] [[http://www.needs-project.org/docs/RS1a%20D7.2%20Final%20report%20on%20advanced%20fossil%20power%20plants.pdf|NEEDS project(2008), Final report on technical data, costs, and life cycle inventories of advanced fossil power generation systems]]
 +
 +[4] [[http://ec.europa.eu/energy/energy2020/roadmap/doc/roadmap2050_ia_20120430_en.pdf|European Commission (2011), Energy Roadmap 2050, Impact assessment and scenario analysis]]
 +
 +[5] TECHPOL database
 +
 +[6] [[http://web.mit.edu/coal/The_Future_of_Coal.pdf|MIT(2007), The future of coal]]
 +