This shows you the differences between two versions of the page.
Next revision | Previous revision | ||
o_m_cost [2014/07/22 16:19] – created codina | o_m_cost [2023/11/16 15:21] (current) – external edit 127.0.0.1 | ||
---|---|---|---|
Line 1: | Line 1: | ||
+ | ====== Operation and maintenance cost (O&M cost) ====== | ||
+ | Facilities operations and maintenance encompasses all that broad spectrum of services required to assure the built environment will perform the functions for which a facility was designed and constructed. | ||
+ | Operations and maintenance typically includes the day-to-day activities necessary for the building and its systems and equipment to perform their intended function, meaning: employees salaries, insurances, etc. | ||
+ | |||
+ | The operation an maintenance cost depends on the installed power of the facility, that is why it is expressed in CHF/kW. It is independent to the number of hours that the facility has been run. |