User Tools

Site Tools


en:nuclear

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
en:nuclear [2020/11/04 06:03]
ses_admin
en:nuclear [2020/11/04 10:11] (current)
ses_admin
Line 12: Line 12:
                 </​header>​                 </​header>​
                 <div class="​paddedContent">​                 <div class="​paddedContent">​
-                    ​The calculator lets you choose the share of energy from Nuclear ​power plants ​in the total electricity production capacity ​in Switzerland in the selected year (2035 or 2050).+                ​The calculator lets you choose the installed capacity ​of nuclear ​power plants in Switzerland in the selected year (2035 or 2050). A higher installed capacity results in higher capital costs (due to the construction and installation of the facilities) but does not necessarily imply a greater power production - it may be more profitable to operate other energy conversion facilities (such as windmills or solar plants).
                 </​div>​                 </​div>​
             </​div>​             </​div>​
Line 52: Line 52:
                 <div class="​paddedContent">​                 <div class="​paddedContent">​
                     <div class="​bloc triple bgWhite">​                     <div class="​bloc triple bgWhite">​
-                        In Switzerland, ​increasing ​the share of nuclear energy in the total electricity production capacity will have the following impacts:+                        In Switzerland, ​an increase of the nuclear power installed capacity may result in a greater power production from this energy resource. In this case, this increase of the share of nuclear energy in the total electricity production capacity will have the following impacts:
                         <div class="​clear"></​div>​                         <div class="​clear"></​div>​
                     </​div>​                     </​div>​
Line 794: Line 794:
  
 ^[[capacity_factor_nuclear|Capacity factor]]^^^ ^[[capacity_factor_nuclear|Capacity factor]]^^^
-^2011 ^2035 ^2050 ^+^2015 ^2035 ^2050 ^
 |0.85 |0.85 |0.85 | |0.85 |0.85 |0.85 |
  
 ^[[nuclear_efficiency|Efficiency]] [%] <​sup>​[[#​References|[4]]]</​sup>​ ^^^ ^[[nuclear_efficiency|Efficiency]] [%] <​sup>​[[#​References|[4]]]</​sup>​ ^^^
-^2011 ^2035 ^2050 ^+^2015 ^2035 ^2050 ^
 |33 |37 |40 | |33 |37 |40 |
  
 ^[[emissions_nuclear|Emissions]]^^^^ ^[[emissions_nuclear|Emissions]]^^^^
-^ ^2011 ^2035 ^2050 ^+^ ^2015 ^2035 ^2050 ^
 |CO<​sub>​2</​sub>​-eq. emissions [kgCO<​sub>​2</​sub>​-eq./​kWh<​sub>​e</​sub>​] |0.0106 |0.00466 |0.000919 | |CO<​sub>​2</​sub>​-eq. emissions [kgCO<​sub>​2</​sub>​-eq./​kWh<​sub>​e</​sub>​] |0.0106 |0.00466 |0.000919 |
 |Deposited waste [UBP/​kWh<​sub>​e</​sub>​] |365 |234 |103 | |Deposited waste [UBP/​kWh<​sub>​e</​sub>​] |365 |234 |103 |
  
 ^[[cost_nuclear|Cost]]^^^^ ^[[cost_nuclear|Cost]]^^^^
-^ ^2011 ^2035 ^2050 ^+^ ^2015 ^2035 ^2050 ^
 |Specific investment [CHF<​sub>​2010</​sub>/​kW<​sub>​e</​sub>​] |4'864 |9'331 |9'331 | |Specific investment [CHF<​sub>​2010</​sub>/​kW<​sub>​e</​sub>​] |4'864 |9'331 |9'331 |
 |Fuel [CHF<​sub>​2010</​sub>/​MWh<​sub>​e</​sub>​] |18.65 |17.45 |17.45 | |Fuel [CHF<​sub>​2010</​sub>/​MWh<​sub>​e</​sub>​] |18.65 |17.45 |17.45 |
en/nuclear.1604469807.txt.gz ยท Last modified: 2020/11/04 06:03 by ses_admin