User Tools

Site Tools

No renderer 'pdf' found for mode 'pdf'

  • Deutsch (German)
  • English
  • Français (French)
  • Italiano
en:cost_nuclear

Nuclear power plant cost

Next tables contain the economic parameters that have been introduced in the nuclear power model. Complementary information about data and assumptions is available in Updates.

Specific investment [CHF2010/kWe]
2011 2035 2050
MIN 4'864 8'294 8'294
MID 9'331 9'331
MAX 10'368 10'368
O&M cost [CHF2010/kWe]
2011 2035 2050
237 [9]135 [6][7][9]135 [6][7][9]
Lifetime [years]2011 50 [8]
2035 60 [4][7]
2050 60 [4][7]
Fuel cost [CHF2010/MWhe]
2011 2035 2050
MIN 18.65 14.68 14.68
MID 16.18 16.18
MAX 17.45 17.45

Old values

References

You could leave a comment if you were logged in.
en/cost_nuclear.txt · Last modified: 2023/11/16 15:21 by 127.0.0.1