+ | ====== Hydro river cost ====== | ||
+ | |||
+ | It has been assumed that the actual 3.8 GW will always be used. The cost for this existing capacity is based on the next data. | ||
+ | |||
+ | ^ Specific investment [CHF< | ||
+ | ^ ^2011-2050 ^ | ||
+ | ^MIN |4'435 < | ||
+ | ^MID |5'300 < | ||
+ | ^MAX |5'500 < | ||
+ | |||
+ | ^ [[o_m_cost|O& | ||
+ | ^2011-2050 ^ | ||
+ | |53 < | ||
+ | |||
+ | ^[[life_time|Lifetime]] [years] |40 < | ||
+ | |||
+ | The first step to calculate the cost of the new capacity is to study how is the new electricity production going to be obtained. It is estimated that in 2050 the extra electricity production from [[hydro_river|Run-of-river]] can amount to 3'600 GWh. This value do not include the reduction due to the effect of [[hydro_value_ranges|LEaux]]. The next table has been created with the information from PROGNOS(2012)< | ||
+ | |||
+ | ^Potential increase in electricity production (2050 compared to 2011) [GWh] ^^ | ||
+ | |New small hydro (<10 MW< | ||
+ | |Renovation |676.5 | | ||
+ | |New big hydro |1' | ||
+ | |**Total** |**3' | ||
+ | |||
+ | A capacity factor of 0.507 has been assumed for obtaining the power capacities from the previous table. The obtained power and the data/ | ||
+ | |||
+ | ==== New small hydro ==== | ||
+ | (<10 MW< | ||
+ | ^ Specific investment [CHF< | ||
+ | ^ ^2035 ^2050 ^ | ||
+ | ^MIN |6'321 |6'196 | | ||
+ | ^MID |8'019 |7'904 | | ||
+ | ^MAX |9'717 |9'612 | | ||
+ | |||
+ | ^ [[o_m_cost|O& | ||
+ | ^2035 ^2050 ^ | ||
+ | |145 |143 | | ||
+ | |||
+ | ^[[life_time|Life time]] [years] |40 < | ||
+ | |||
+ | ==== Renovation ==== | ||
+ | The cost for the extra capacity obtained through renovation is 5'224 CHF/ | ||
+ | |||
+ | ==== New big hydro ==== | ||
+ | The cost is based on the data for the already [[#Hydro river cost|existing facilities]]. | ||
+ | |||
+ | |||
+ | ===== References ===== | ||
+ | [1] [[http:// | ||
+ | |||
+ | [2] [[http:// | ||
+ | |||
+ | [3] [[http:// | ||
+ | |||
+ | [4] [[http:// | ||
+ | |||
+ | [5] [[http:// | ||
+ | énergétique 2050]] | ||
+ | |||
+ | [6] [[http:// | ||
+ | |||
+ | [7] [[http:// | ||