User Tools

Site Tools


  • Deutsch (German)
  • English
  • Français (French)
  • Italiano
en:capacity_factor

Capacity factor

Capacity factor is a measure of how often an energy supply system (power plant, boiler, etc) runs for a specific period of time. It indicates how much energy a system actually supplies relative to the maximum it could supply at continuous full power operation during the same period.

You could leave a comment if you were logged in.
en/capacity_factor.txt · Last modified: 2023/05/29 15:11 (external edit)