Next tables contain the economic parameters that have been introduced in the Advanced cogeneration model. All the data is extracted from the NEEDS report [1]. The correspond to the “Tubular CHP NG” data set for SOFC systems. The data for 2025 has been used for 2035 in the model.
Specific investment [CHF2010/kWe] | ||
---|---|---|
2035 | 2050 | |
MIN | 3'135 | 1'380 |
MID | 11'837 | 8'972 |
MAX | 34'508 | 34'508 |
O&M cost [CHF2010/kWe] | |
---|---|
2035 | 2050 |
237 | 178 |
Lifetime [years] | 20 |
---|