 +====== CCGT capacity factor ======
 +The [[capacity_factor|capacity factor]] for 2035 and 2050 is variable because the [[combined_gas_cycle_more|CCGT]] is treated in a special way in the calculator: it is assumed that this technology will only be following peak demand profile when existing technologies cannot cover this demand. Thus it is assumed that [[combined_gas_cycle_more|CCGT]] plants will never generate excess electricity. Therefore its [[capacity_factor|capacity factor]] will be 0.8 (7000 hours/year <sup>[[#References|[2]]]</sup>) or lower.
  
 +===== References =====
 +[1] [[http://www.strom.ch/uploads/media/AES_DCB_09_CCC_03-2013.pdf|VSE(2012), Centrales à gaz à cycle combiné (CCC)]]
 +
 +[2] [[http://www.needs-project.org/docs/RS1a%20D7.2%20Final%20report%20on%20advanced%20fossil%20power%20plants.pdf|NEEDS project(2008), Final report on technical data, costs, and life cycle inventories of advanced fossil power generation systems]]