This shows you the differences between two versions of the page.
Next revision | Previous revision | ||
capacity_factor_hydro_dam [2014/07/23 16:22] – created codina | capacity_factor_hydro_dam [2023/11/16 15:21] (current) – external edit 127.0.0.1 | ||
---|---|---|---|
Line 1: | Line 1: | ||
+ | ====== Hydro dam capacity factor ====== | ||
+ | The [[capacity_factor|capacity factor]] of a hydro dam is the ratio between the average electricity production and the installed power. The average electricity production and the installed power were 17'286 GWh and 8.08 GW respectively in 2011 < | ||
+ | ===== References ===== | ||
+ | [1] [[http:// |