Next tables contain the economic parameters that have been introduced in the geothermal power plant model.
Specific investment [CHF2010/kWe] | ||
---|---|---|
2035 | 2050 | |
MIN | 5'293 [2] | 4'500 [1] |
MID | 11'164 [1][2] | 6'310 [1][2] |
MAX | 16'700 [1] | 10'000 [1] |
O&M cost [CHF2010/kWe] * | |
---|---|
2035 | 2050 |
391 | 221 |
*The O&M is considered to be the 3.5% of the investment cost [1]