Advanced cogeneration cost

Next tables contain the economic parameters that have been introduced in the Advanced cogeneration model model. All the data is extracted from the NEEDS report [1]. The correspond to the “Tubular CHP NG” data set for SOFC systems. The data for 2025 has been used for 2035 in the model.

Specific investment [CHF2010/kWe]
2035 2050
MIN 3'135 1'380
MID 11'837 8'972
MAX 34'508 34'508
O&M cost [CHF2010/kWe]
2035 2050
237 178
Lifetime [years] 20

References

[1] NEEDS (2008), Final report on technical data, costs and life cycle inventories of fuel cells.