Centralized direct electric heating

Next tables contain the economic parameters that have been introduced in the Centralized direct electric heating model.

Specific investment [CHF2010/kWe]
2011-2050
MIN 243 [1]
MID 284 [1]
MAX 365 [1]
O&M cost [CHF2010/kWe]
2011-2050
14 [1]
Lifetime [years] 15 [1]

References

[1] NERA & AEA (2009), The UK Supply Curve for Renewable Heat, Study for the Department of Energy and Climate Change.