====== Decentralized direct electric heating cost ====== Next tables contain the economic parameters that have been introduced in the [[d_direct_elec|Decentralized direct electric heating]] model. ^ Specific investment [CHF2010/kWe] ^^ ^ ^ 2011-2050 ^ ^MIN |48 [[#References|[2]]]| ^MID |240 [[#References|[1]]][[#References|[2]]]| ^MAX |485 [[#References|[2]]]| ^ [[o_m_cost|O&M cost]] [CHF2010/kWe] ^ ^ 2011-2050 ^ |8 [[#References|[2]]]| ^[[life_time|Lifetime]] [years] |15 [[#References|[1]]]| ===== References ===== [1] [[http://www.rhincentive.co.uk/library/regulation/0907Heat_Supply_Curve.pdf|NERA & AEA (2009), The UK Supply Curve for Renewable Heat, Study for the Department of Energy and Climate Change.]] [2] [[http://ec.europa.eu/energy/strategies/2008/doc/2008_11_ser2/strategic_energy_review_wd_cost_performance.pdf|Commission of the European Communities (2008), Energy Sources, Production Costs and Performance of Technologies for Power Generation, Heating and Transport]]