====== Advanced cogeneration cost ====== Next tables contain the economic parameters that have been introduced in the [[d_adv_cogen|Advanced cogeneration model]] model. All the data is extracted from the NEEDS report [[#References|[1]]]. The correspond to the "Tubular CHP NG" data set for SOFC systems. The data for 2025 has been used for 2035 in the model. ^ Specific investment [CHF2010/kWe] ^^^ ^ ^2035 ^2050 ^ ^MIN |3'135 |1'380 | ^MID |11'837 |8'972 | ^MAX |34'508 |34'508 | ^ [[o_m_cost|O&M cost]] [CHF2010/kWe] ^^ ^2035 ^2050 ^ |237 |178 | ^[[life_time|Lifetime]] [years] |20 | ===== References ===== [1] [[http://www.needs-project.org/RS1a/RS1a%20D9.2%20Final%20report%20on%20fuel%20cells.pdf|NEEDS (2008), Final report on technical data, costs and life cycle inventories of fuel cells.]]